Final Sequence Painting-

    Create a sequence of
    five 8″x8″ paintings.
    Due Dates
    Over the course of
    your sequence the
    Planning
    compositions must
    sketches
    make shifts in both
    posted in
    color (hue and
    forum by
    value) and form, have
    11:59 PM
    at least one panel that
    on June
    implies
    15th
    transparency, and
    must make a
    Peer
    transition between
    responses
    geometric and
    to planning
    organic forms. The
    sketches
    shifts in form should
    due by
    be dramatic and
    noon
    on
    logical, such that
    June 16th
    each panel is
    necessary for the

    1st Rough
    success of the overall
    Draft Due
    sequence so much
    brought to
    So, that if you were to
    class
    or
    Compare the first and
    June 17th
    last panels you would
    not believe them to

    2nd Rough
    be related.
    Draft
    posted to
    Planning Sketches:
    forum by
    Should include
    10:20AM
    drawings of at least 3
    on June
    full sequences. While
    21th
    the dravwings do not
    need to be in color –
    Peer
    they should explain
    Feedback in
    the use of color and
    forum by
    how it vwill transition
    11:59 PM
    from panel to panel.
    on June
    You can do that by
    21th
    making color
    sketches or you could

    Final Due
    do that by coding your
    on June by
    forms similar to
    8:30AM on
    making a paint by
    June 25th
    number. I like to do
    both. we will discuss
    strategies for this in
    our live session)

    First Rough Draft:
    All forms should be
    penciled in on all panels, and painting
    should be in progress on at least1 -2
    panels. The idea should be communicated

                                                                                                                                      Order Now